Central Suriname Nature Reserve (04.01.2014 to 06.30.2014)

You are here

PDF versionPDF version
Year: 
2014
Quarter: 
April - June
Communications activities: 

There were no educational activities

Unusual Events at the TEAM Site: 

There were no unusual events at the TEAM site

New Species: 

No new species found

Protocol Activities: 

Terrestrial vertebrates protocol: The collected data from array 1 and array 2 was processed with DeskTEAM and the datafile was uploaded to the TEAM network database. Almost 17,000 pictures were processed.

Climate protocol: The weather station was maintenanced on June 3rd and data was uploaded to the TEAM network database successfully.

Vegetation protocol: No activities

 

Protocol Problems: 

Installation of DeskTEAM on the HP laptop was a little difficult, but after communication and assistance from the TEAM Network technical coordinator this problem was solved and made the processing of the pictures possible.

Schedule Problems: 

There were no schedule problems after the proposed sampling schedule was adapted

Logistical Problems: 

There were no logistical problems