On july 20th 2013 CI president Russell Mittermeier visited the TEAM site in CSNR together with the new executive director of CI-Suriname, John Goedschalk. The site manager gave a presentation of the different protocols, buildings, trails systems and working methods to the new director. He was very enthausistic about the work TEAM does in the CSNR.

Unusual Events at the TEAM Site: 

In this period there were no unusual events witnessed.

New Species: 

No new species were found. Only the climate protocol was actively implemented in the field in this period.

Protocol Activities: 

In this period there were no activities for the vegetation protocol impemented.

In this period the identification of the camera trap pictures of the terrestrial vertebrates protocol was finalized and submitted to the TEAM database.

In this period climate data was collected three times from the weather station in CSNR and data was submitted. 

Protocol Problems: 

There were some problems with the climate station, because one temperature sensor was not working. Communication with the TEAM technical director was very important and crucial to solve the problem. Documentation in the form of text, diagram and videos were provided by the TEAM technical director. The problem was solved by following the directions.

Schedule Problems: 

There were no schedule problems

Logistical Problems: 

There were no logistical problems